NZO
14/08/2007
MINE
REL: 1709 HRS New Zealand Oil and Gas Limited
MINE: NZO: NZOG'S Hector-1 drilling report 14 August 2007
New Zealand Oil & Gas Limited ("NZOG") reports that at 0600 hours today, the
Hector-1 well was being plugged and abandoned at a total measured depth of
3,825 metres.
After completion of operations at Hector-1, the Ocean Patriot rig will be
moved to drill the Taranui-1 well in PMP 38158. NZOG estimates the Taranui
Prospect to potentially have an estimated 15 million barrels of recoverable
oil. A discovery at Tarnui-1 would most likely be fast-tracked for
development through the existing Tui area FPSO and facilities.
ENDS
- Forums
- ASX - By Stock
- NZO
- oil production started at the tui
oil production started at the tui , page-17
Featured News
Add NZO (ASX) to my watchlist
|
|||||
Last
40.5¢ |
Change
0.015(3.85%) |
Mkt cap ! $90.70M |
Open | High | Low | Value | Volume |
39.0¢ | 40.5¢ | 39.0¢ | $31.54K | 78.96K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 6801 | 39.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
42.0¢ | 5850 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 6801 | 0.390 |
1 | 2908 | 0.375 |
1 | 10846 | 0.370 |
1 | 2698 | 0.365 |
2 | 89367 | 0.360 |
Price($) | Vol. | No. |
---|---|---|
0.420 | 5850 | 2 |
0.430 | 327266 | 1 |
0.440 | 15000 | 2 |
0.500 | 431 | 2 |
0.730 | 27 | 1 |
Last trade - 15.36pm 25/07/2024 (20 minute delay) ? |
Featured News
NZO (ASX) Chart |