Drilling programme SNE -5, VR-1, SNE-6, FAN-Sth and SNE North.
SNE -5 spud around 23 rd Jan. SNE -North finished around 7 th August.....approx 182 days.
FAR's 17% paying share at 850k per day =32.9 mill. AU.
End of June FAR had 91.3 mill- 32.9 mill = 58.4 mill left over after paying for drilling 5 wells two of which were drilled to 5000m+ another had a interference test and another had DST.
I think 3 wells next year....WPL only have 1 booked, 3 x 25 days x 850k= ~ $13.5 million to FAR. These wells will most likely be much cheaper than this because of the water depth and rig type required but I have used the higher Stenna number.
58.4 - 13.5= 44.9 million left.
I think its safe to say that we have a fair safety margin for the next 12 months. DB
- Forums
- ASX - By Stock
- FAR
- January 2016 Brent V FAR
January 2016 Brent V FAR, page-8
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
|
|||||
Last
50.0¢ |
Change
-0.015(2.91%) |
Mkt cap ! $46.20M |
Open | High | Low | Value | Volume |
52.5¢ | 52.5¢ | 50.0¢ | $45.91K | 88.73K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5993 | 50.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.5¢ | 5982 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 0.500 |
2 | 28930 | 0.480 |
2 | 70000 | 0.475 |
3 | 84150 | 0.470 |
2 | 60000 | 0.465 |
Price($) | Vol. | No. |
---|---|---|
0.520 | 50000 | 1 |
0.530 | 10000 | 1 |
0.540 | 22471 | 1 |
0.550 | 82295 | 3 |
0.590 | 5000 | 1 |
Last trade - 15.08pm 28/06/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online