DB and H-
First, good morning!
Agreed (DB) r.e. drilling A2 ASAP, and you and I have had this exchange before. I'd like to stick a hole in A2 before a JV/JOA in the Gambian blocks- in order to establish value. But I doubt that will happen, and that would burn some serious cash. Also, I'm pretty sure that everyone has looked at the re-worked 3D. I'd bet they already know where they want to target first.
I looked at the Stena website only an hour or two ago. Several of the DP Class 3 ships seem to be available starting next month... and one of those is the DrillMax. Not sure if this info is up-to-date. See availability chart copied below. Hope they don't mind that I boosted this, I doubt they would.
-walk
- Forums
- ASX - By Stock
- FAR
- A lot of catalysts near term
A lot of catalysts near term, page-3
-
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
45.5¢ |
Change
-0.005(1.09%) |
Mkt cap ! $42.04M |
Open | High | Low | Value | Volume |
46.5¢ | 46.5¢ | 45.5¢ | $160.1K | 347.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 86870 | 45.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
47.0¢ | 121519 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 86870 | 0.455 |
6 | 298578 | 0.450 |
1 | 30000 | 0.445 |
3 | 105000 | 0.440 |
2 | 90000 | 0.435 |
Price($) | Vol. | No. |
---|---|---|
0.470 | 121519 | 4 |
0.475 | 6667 | 1 |
0.480 | 1300 | 1 |
0.500 | 3792 | 2 |
0.600 | 3176 | 2 |
Last trade - 16.10pm 20/06/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online