RVR has been ramped up early.
Thalanga Mine processing plant throughput has ramped up to annualised rate of 325ktpa
• Mining and processing rates now exceed the design rate forecast in the Thalanga Restart Study (2015)
• Ramp up completed ahead of schedule and approximately $1m under budget
• Metallurgical recoveries and concentrate grades approaching Restart Study design parameters
• 13,500 tonnes of low to medium-grade ore processed since production commenced with high grade ore now being blended into the mill feed as required
• First concentrate deliveries will commence in the coming weeks and first cash flow is imminent thereafter.
- Forums
- Commodities
- ZINC
- ASX Zinc players list
ZINC
zinc futures
Add to My Watchlist
0.08%
!
$2,575.9

ASX Zinc players list, page-455
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$2,575.9 |
Change
0.000(0.08%) |
Mkt cap ! n/a |
Open | High | Low |
$2,575.9 | $0.00 | $0.00 |
Featured News
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Dr Michael Thurn, CEO & MD
Dr Michael Thurn
CEO & MD
SPONSORED BY The Market Online