The key is the term 'homogenous'. I am also suspecting that they think the pegmatite itself at Roche is 'uniform'. Basically as a result they don't think they need the 50 metre to 100 metre spacing to define a measured and indicated resource, so in another words they plan to have less drill cores but still believe they will comply with the JORC code.
As I said in the past, noone mines on 'inferred' but mines on 'measured and indicated' so this announcement has probably reduced the timeline to define a JORC given the term 'homogenous' and the likely concept of 'uniform' (although not specifically stated) meaning less drill cores in that area to prove up a resource. Or another way to put it they are expecting the drill core results around that area to be similar to the drill core they previously reported to market. All IMO
- Forums
- ASX - By Stock
- AVZ
- Ann: Initial mineral characterisation results positive for Manono
Ann: Initial mineral characterisation results positive for Manono, page-38
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online