The Feasibility Optimisation announcement is even better than it first sounded.
The announcement mentions "+25%" increase on the previous design output. But going from 6 hours of generation per day to "more than 8 hours" per day for the same rate of power generation is actually a +33% increase on the previous design output.
So anyone revisiting their financial analysis on the better output (and at reduced capex!), should use +33% on the previous base assumption (not +25%).
- Forums
- ASX - By Stock
- GNX
- Ann: Pumped Storage Hydro Update - Feasibility Optimisation
Ann: Pumped Storage Hydro Update - Feasibility Optimisation, page-10
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $380.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GNX (ASX) Chart |
Day chart unavailable