NSH,
My take on the timing is a little bit different to yours though in the same ballpark. Assuming they have to flow back onto a pipeline. My timing is:
Perforate - 1 day
Frac setup - 2 days
Frac - Max 3 days as is a vertical leg only
Demob frac gear - 1 day
Mobilise and tie in test separators - 2 days
Flow back frac fluid - 5 days (Probably have to rock the well a few times)
Allow flows to stabilise - 2 days
Pressure build up and flow test - 2 days
This outlook assumes a no result should be reported early, a delayed result is looking better.
I have been in on this one for 2 ½ years and have already made a pretty nice profit. If this is the big one and it takes off I might just retire from the oil patch and just trade or invest in oil stocks.
Cheers
Jami
- Forums
- ASX - By Stock
- DXI
- calm before the storm
calm before the storm, page-25
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DXI (ASX) to my watchlist
|
|||||
Last
$2.89 |
Change
0.070(2.48%) |
Mkt cap ! $916.9M |
Open | High | Low | Value | Volume |
$2.83 | $2.93 | $2.83 | $1.159M | 401.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 2695 | $2.87 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.89 | 2 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2695 | 2.870 |
2 | 2723 | 2.860 |
2 | 50795 | 2.850 |
1 | 795 | 2.840 |
1 | 795 | 2.830 |
Price($) | Vol. | No. |
---|---|---|
2.890 | 2 | 1 |
2.900 | 4928 | 2 |
2.910 | 4928 | 2 |
2.960 | 795 | 1 |
2.970 | 820 | 2 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
DXI (ASX) Chart |