if it was just frack fluid like it has been suggested by company. this should have well and truly been pumped out by now.
the concrete casing if not done correctly would be very vulnerable to cracking/breaking.
I think the real energy should address shareholders about this dewatering issue rather than saying its likely frack fluid.
or it is just frack fluid and takes 3 months to pump out.. which doesn't make logical sense to me. did it take 3 months to pump it in? I don't thin so
RLE Price at posting:
7.8¢ Sentiment: None Disclosure: Not Held