Hi Goonbag,
The JV has expansion plan in two projects, included a copper ore concentrator (basically process low grade copper ores to high grade copper ores) and this why the production will increased by 333% very soon. there was 2.2mn pound has been raised for production expansion and copper ore exploration purposes.