Following the drilling and completion of the Lidsey-X2 horizontal production well, which was drilled on time and within budget, the Company is working through the production start-up and production has now been initiated. Initial start-up rates of production from the Great Oolite reservoir are coming in at forty barrels of 38.5 API of dry oil per day. The fluid column (oil) extends to 322m from surface (bottom hole depth of 1,009.3m) with a measured static bottom hole pressure of 764 psi. The Great Oolite is the first of three reservoirs with potential viability in Lidsey-X2 as per the Company RNS of 6 November 2017.
- Forums
- ASX - By Stock
- AZ9
- IPO - Doriemus PLC
IPO - Doriemus PLC, page-245
-
-
- There are more pages in this discussion • 151 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZ9 (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.010(10.5%) |
Mkt cap ! $31.73M |
Open | High | Low | Value | Volume |
9.5¢ | 10.8¢ | 9.2¢ | $1.647M | 16.40M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1055480 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 269651 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1055480 | 0.100 |
1 | 15151 | 0.099 |
1 | 25000 | 0.097 |
3 | 656060 | 0.095 |
2 | 175943 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 269651 | 5 |
0.110 | 1824984 | 12 |
0.115 | 104111 | 4 |
0.120 | 236382 | 4 |
0.125 | 1530 | 1 |
Last trade - 16.10pm 05/11/2024 (20 minute delay) ? |
Featured News
AZ9 (ASX) Chart |