KEY 0.00% 0.1¢ key petroleum limited

turn the key, page-2

  1. 1,263 Posts.
    lightbulb Created with Sketch. 3
    Investors and advisors Presentation announcement out now.

    Extract:

    Kiliwani Wells: Estimated Un-risked Potential -Recoverable Gas and Oil


    Kiliwani#1 (Gas) will test:
    Reservoir: Sandstones with moderate to good porosities
    Source: Close offset to SongoSongoGas Field
    Seal: Overlying marine shalesand claystones
    Trap: Faulted anticline
    Un-risked Potential Gas: Mean Expected (est) 250 BCF
    Drill Schedule: Current spud date is +/-1stNovember 2007
    Duration +/-45 days



    KiliwaniNorth #1 (Gas) will test:
    Reservoir: Sandstones with fair to moderate porosities
    Source: Close offset to SongoSongoGas Field
    Seal: Overlying marine shalesand claystones
    Trap: Faulted anticline
    Un-risked Potential Gas: Mean Expected (est) 10 -15 BCF


    KiliwaniNorth #1 (Oil) will test:
    Reservoir: Sandstones with fair to moderate porosities
    Source: Potential oil source rock in Upper Cretaceous
    Seal: Interbeddedmarine shalesand claystones
    Trap: Structural / StratigraphicTrap
    Un-risked Potential Oil: Mean Expected (est) 10 mmbbls(Recoverable –Based on 35% recovery factor)
    Drill Schedule: Current spud date is +/-1stJanuary 2008
    Duration +/-TBC days
    Kiliwani Wells: Estimated Un-risked Potential -Recoverable Gas and Oil


    Cheers
    R

 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.