Two things of note:
At Riverina, "Further results over the 600M of strike are due in the near future"
At Mt Banjo, Macedon, results from 6 holes drilled range from 1.7 gr/T to 6.9 gr/T with widths from 2 to 7 meters. Check out MON announcements on ASX site.
Much more news to be released soon. Have we turned the corner?
Add to My Watchlist
What is My Watchlist?