Further more to the rockhole bore area
2000 X 600 = 1.2 million sq meters.
if mineralisation is only an average of 10m thick this be and additional 12 million cubic meters of iron ore X 3 tonne per cubic meter is an aditional 36 million tonnes.
Rockhole Bore had drill intercepets of up to 36m of mineralisation. So a calculation of 10m average thickness is being very very conservative, Rockhole bore could deliver the companys target of 100 million tonnes in conjuction with the North west sector
- Forums
- ASX - By Stock
- YML
- rockhole bore
YML
unknown
rockhole bore, page-2
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)