Snowy 2-0 is too big, too expensive, is centralised and will take years to build, give me the flexibility that small scale pumped hydro storage offers, any day.
"Prime Minister Malcolm Turnbull's much-hyped 'Snowy 2.0' expansion has been given the green light, however the scheme will cost at least 50 per cent more than first thought and won't be switched on for at least six years."
http://www.canberratimes.com.au/fed...st-increases-50-per-cent-20171219-h07onp.html
- Forums
- ASX - By Stock
- GNX
- Snowy 2.0
Snowy 2.0
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares