In the nearby Silversands-1 oil discovery (Sheringa approx 2.5km South),
"An open-hole production test over the interval 1354 - 1358.3 metres in the secondary objective Namur Formation flowed at an estimated rate of 860 barrels of
oil per day and 340 barrels of water per day."
And from the Christies-5 oil well (Sheringa approx 3km SE),
"Ran electric logs. Ran DST-1 across the interval 1,626m to 1,636m in the Birkhead Formation, resulting in a flow of 85 bbl/d of oil and 80 bbl/day of water
through a ¼” choke. DST-2 was run across the interval 1,377m to 1,382.5m in the Mid Namur reservoir, resulting in a flow of 318 bbl/d of oil and 851 bbl/d of water."
Pulse.
- Forums
- ASX - By Stock
- COE
- sheringa 1
sheringa 1, page-4
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add COE (ASX) to my watchlist
|
|||||
Last
22.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $580.8M |
Open | High | Low | Value | Volume |
22.0¢ | 22.5¢ | 21.5¢ | $453.9K | 2.079M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 397271 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 571015 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 397271 | 0.215 |
10 | 811154 | 0.210 |
14 | 743786 | 0.205 |
21 | 777779 | 0.200 |
9 | 498466 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 571015 | 8 |
0.230 | 1225990 | 11 |
0.235 | 700087 | 14 |
0.240 | 3821391 | 25 |
0.245 | 282988 | 8 |
Last trade - 16.10pm 24/07/2024 (20 minute delay) ? |
Featured News
COE (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
Previous Video
Next Video
SPONSORED BY The Market Online