So assuming peg/lithium is consistent between holes 7 and the latest high grade grabs 750m away to the SW how much in terms of tonnage could we be talking about in that extension alone ???
So mineralised envelope for section between holes 7 and new grabs to the s'west:-
750m x 250m x 200m x 2.8SG = 105mt @ 1.4% Li20 (for Carrier De L'est Extension alone!!)
This would be bigger than most current lithium hard rock players defined resource on the ASX with the exception of KDR and PLS (excluding EMH as too low grade). Remember this is just the extension. I wonder if they will upgrade the Project Target statement.
Unfortunate about the delay but these things happen. On the flip side it clears us from the wettest month of year in area which is Dec.