Back of the envelope calculation.
Resource target for 15kms 33 to 44 MT.
Conservatively say 33 MT.
Potential strike 100kms, so 33/15x 100= 220 MT total resource target on a conservative basis.
Halve that just for more conservative measure and we still have 110MT resource on an ultra conservative basis.
Minimum 550 million MC expected at $5 per MT ( peer comparison - pre-production ).
Max resource could be 44/15 x 100= 293MT so MC expected = 293 x $5 = 1,466 Million.
Average min and max MCs = (550+ 1,466)/2= $ 1,008 milion.
Which gives SP at todays shareholdings at $1.70
Say dilution of 20% with cap raisings
So expected avg SP pre production is $1.36
Of course all going as per plan, mets, etc etc
Enjoy the ride
- Forums
- ASX - By Stock
- CLA
- CLA-mining considerations
CLA-mining considerations, page-55
-
- There are more pages in this discussion • 208 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add CLA (ASX) to my watchlist
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $26.70M |
Open | High | Low | Value | Volume |
1.1¢ | 1.1¢ | 1.0¢ | $159.9K | 15.01M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 6692274 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 1751934 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 4892274 | 0.010 |
12 | 5725441 | 0.009 |
7 | 6855074 | 0.008 |
2 | 588560 | 0.007 |
1 | 200000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 1751934 | 5 |
0.012 | 733849 | 2 |
0.013 | 913728 | 6 |
0.014 | 263858 | 2 |
0.015 | 3013153 | 7 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
CLA (ASX) Chart |