ARV 8.33% 1.1¢ artemis resources limited

Some Points From QH Tele-confab, page-19

  1. 27 Posts.
    The Nichol River plant is still at Nichol River. It has a capacity of around 100 tonnes per hour and needs about 60 litres of water per second. Water was an issue at Nichol River. The fitout at Radio Hill has started and should take 6 months. The plant will process Nickel, copper, gold and cobalt. Its all about the cobalt, the gold was always a bonus.
 
watchlist Created with Sketch. Add ARV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.