ESS 0.00% 50.0¢ essential metals limited

No News - My take, page-2

  1. 646 Posts.
    lightbulb Created with Sketch. 58
    Firstly I dont want to be seen as a down ramper because im not a downramper I only say it as I see it.
    1 RC rig should drill 3000 metres is 2 weeks if he doesnt take any days off due to poor conditions...weather ,mud, rain etc.
    So the drilling started on Wednesday 1st November, after drilling we are now half way through November to 15th on an approximate date.....normally drill results will take 4 weeks to be reported give or take a week or 2...lets say 6 weeks for ample time, that timeline brings us to about 1st January, everyone is away until 8th January, so another week until now the 13th January....so you now see with ample spare time given the results are still not reported from the November 1st drill on Lithium.
    From my experience when results are delayed substantially, it usually isnt good news.
    So its now 2.5 months from the time that the drills hit the rock on the Lithium so when will the Cobalt results be from Ann 21st November.

    To be honest I would like to throw some cash this way but the long time lines scare the crap out of me.
 
watchlist Created with Sketch. Add ESS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.