From the Oct update:
New Talisman is pleased to announce that progress on refurbishment of the mine workings has now reached the 540m mark inside the No 8 level Drive and access to the Mystery vein is now possible. A 200kg sample of vein material, to be used in metallurgical testwork for the underground concentrator plant, has been taken from the face of the Mystery Vein Drive.
Inside the level 8 adit, reconstruction of the underground bridge, which will allow vehicle movements over the old stopes, is now all but complete. The historic support that was constricting the drive has been dismantled and replaced with rock anchors and mesh. This has significantly widened the drive and there is now sufficient space for the mini loader to pass safely through the area.
Does this help?
- Forums
- ASX - By Stock
- NTL
- NTL - Progress under the Radar - Is it the next Disallowed?
NTL - Progress under the Radar - Is it the next Disallowed?, page-62
-
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.13M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 2.1¢ | $139 | 6.626K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 626 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 346000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 626 | 0.021 |
1 | 10000 | 0.020 |
1 | 556513 | 0.019 |
1 | 300000 | 0.018 |
1 | 70000 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 346000 | 2 |
0.029 | 344827 | 1 |
0.050 | 250000 | 1 |
0.077 | 25000 | 1 |
0.000 | 0 | 0 |
Last trade - 15.20pm 01/11/2024 (20 minute delay) ? |
Featured News
NTL (ASX) Chart |