C7A 0.00% 0.9¢ clara resources australia ltd

Accumulated tin at Granville., page-22

  1. 7,246 Posts.
    lightbulb Created with Sketch. 606
    So your saying
    30t stockpile
    36t tailings
    66 tonnes total accumulated concentrate.

    G2 : will resume mining at the high grade Granville East Mine where drilling confirms results of :
    7m @ 2.22%sn from 2m
    7m @ 2.65%sn from 4m
 
watchlist Created with Sketch. Add C7A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.