Was just reading this. Canberra is trialing them at the moment to buy 40 (10% of fleet).
"Between August 1 and January 1, the electric bus has recorded 643 trips, used 11934kwH of electricity and had one breakdown.
The hybrid bus has been on 487 trips, used 3966 litres of diesel (the control buses used about four times as much diesel) and broken down twice.
Neither type of bus has run out of power while on the road, however the electric bus has had six days of unscheduled maintenance while the hybrid bus has had nine days of unscheduled maintenance.
"With any new technology, there will always be challenges, operational and technical. We have a dedicated team supporting this service," the spokeswoman said."
- Forums
- ASX - By Stock
- CXO
- Ann: 86m Spodumene Pegmatite Intersected at BP33 Prospect
Ann: 86m Spodumene Pegmatite Intersected at BP33 Prospect, page-27
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
-0.005(4.35%) |
Mkt cap ! $235.7M |
Open | High | Low | Value | Volume |
11.5¢ | 12.0¢ | 11.0¢ | $763.3K | 6.655M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
140 | 7355413 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 3968025 | 36 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
140 | 7416084 | 0.110 |
76 | 4511385 | 0.105 |
165 | 11188814 | 0.100 |
12 | 476397 | 0.099 |
6 | 113678 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 3887970 | 35 |
0.120 | 2892937 | 44 |
0.125 | 3275198 | 41 |
0.130 | 5098142 | 41 |
0.135 | 3090905 | 40 |
Last trade - 12.02pm 16/10/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online