I’m not sure what the average metres per day of RC drilling is and it’s likely dependent on lots of factors. Let’s, for arguments sake, assume a base rate of 100m/day per rig. So with one rig, 100,000m would take 1,000 days. How many rigs to achieve 100,000m in 12 months? Would need 3 rigs (actually 2.7 but we’ll round up) operating full time drilling 100m/ day for 365 days to drill 100,000m. Obviously this could be more or less based on the average depth drilled each day via RC drilling. Anyone have a clue about this rather than my waffle?
- Forums
- ASX - By Stock
- PTN
- Ann: Drilling Resumes at the Leonora Gold Project
Ann: Drilling Resumes at the Leonora Gold Project, page-31
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PTN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.005(8.47%) |
Mkt cap ! $104.7M |
Open | High | Low | Value | Volume |
6.4¢ | 6.4¢ | 6.2¢ | $209.1K | 3.303M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 120522 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 576341 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 120522 | 0.062 |
1 | 163934 | 0.061 |
3 | 1110000 | 0.060 |
3 | 381890 | 0.059 |
3 | 123387 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 576341 | 1 |
0.065 | 375000 | 2 |
0.066 | 454563 | 2 |
0.067 | 40000 | 1 |
0.068 | 117874 | 2 |
Last trade - 16.10pm 14/11/2024 (20 minute delay) ? |
Featured News
PTN (ASX) Chart |