Come on AVZ where are the rigs?
Stuck in port?
Stuck on the road?
On site but being assemble?
Assembled and ready to start drilling?
5 rigs drilling at the same time would require a fair amount of crew I would imagine, does AVZ have the necessary man power available - on site or otherwise?