Approx 14 holes needed at Roche Dure and we are drilling hole 5 now and with 2 additional rigs on site (reported Monday this week) I expect they have started hole 6 and 7 already. Rig 4 expected next week will start drill hole 8. Probably looking at about beginning to mid April to complete that many holes and perhaps late May for assays from these holes assuming they are flying the 120g samples out to Oz.
"...The samples collected from outcrops are comprised of
rock-chips. The bagged samples were sent to ALS
Lubumbashi (DRC) where they were crushed and
pulverized to a pulp. A 120g subset was split from the
pulp and sent to ALS Perth (Western Australia) for
analytical determination.
The sample preparation for drill-core samples
incorporates standard industry best-practice and is
appropriate. The half-core samples are sent to ALS
Lubumbashi where they are crushed and then pulverized
to produce a pulp. A 120gm subsample is split and then
exported to Australia for analytical determination...."
- Forums
- ASX - By Stock
- AVZ
- Ann: AVZ signs MoU with Guangzhou Tinci Materials Technology Co
Ann: AVZ signs MoU with Guangzhou Tinci Materials Technology Co, page-99
-
- There are more pages in this discussion • 108 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)