RNE 0.00% 0.2¢ renu energy limited

habanero 3, page-12

  1. 286 Posts.
    I may sound optimistic, but Hab-2 took 6 days to drill from 3737m to 4060m with the best day achieving 80m.
    The last section took 6 days to drill the same interval the best day being 59m.

    Drill rates can be surprisingly fast, as long as there are no problems. They have a lot of experience now in minimizing problems.

    There will be no Christmas break and drilling will be 24 hours a day and 7 days a week.
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.