OGX 0.00% 0.3¢ orinoco gold limited

ATM, page-12

  1. 2,243 Posts.
    lightbulb Created with Sketch. 58
    Thanks again Saltigate for you answer.
    So the 50 tonne HM is to be installed at the head of the gravity mill and it will probably take a bit more tweaking than our operating 25 tonne HM .
    I think it was stated it would be 44 days from instal to fully operational so possibly a large ramp up of production at the end of April .
    I can't wait .
    They should have ironed out the bugs with underground drilling of production ore by then and we will have results of other exploration digs ie the swimming pools and the like as well as the second shift of HM3 processing the tailings in stockpile .
    Good times ahead.
 
watchlist Created with Sketch. Add OGX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.