Certainly some higher grades in the tailing than the 9.3 gram average thus far.
Do we remember this
Importantly the MSM batch was a blend of both stope and development ore.
This same batch was processed in a much larger quantity of 100 tonnes through the gravity plant on December 22 -and achieved a grade of only 2 g/t.!!!?????
This same MSM batch of material was reprocessed & through the hammer mill &
returned 26.64g p/t.
So where did the other 24.64 grams of the 100 tonne batch go?
2,464grams of gold-2.46 kg's just in this one stuff up alone !
To tails of course -so recovery ATT from this 100 tonne batch was a pathetic
7.6% & the other 92.4% went to tails !
How many times did this happen-often obviously
There are quiet obviously some pockets of very high grade indeed in the tailings.
salt