Short Term Trading Week Starting: 19th Mar, page-125

  1. 3,816 Posts.
    lightbulb Created with Sketch. 22
    STTCOMP AVB, FA LONG

    Avanco Copper, Copper/Gold Miner Brazil

    MC $189m at .077c/share
    SOI 2.45B (needs consolidation)
    Borrowings $16m
    COH $24m (31/12 Presentation 27/02)
    NPTA $2.5m (after interest)

    Actually running at a profit: "Avanco Resources reported 37% increase in contained gold ounces, and a 34% increase in gold grade at the Contact deposit within the CentroGold project. Infill drilling has resulted in a 34% increase in gold grade and a 2% increase in tonnes, for a 37% increase in contained ounces of gold. Within the Contact MRE, Indicated Mineral Resources have increased by 203% to 509,000oz at a grade of 3.6 g/t gold. Additional high-grade and visible gold was discovered on sections not previous drilled fully and on new infill sections. This accounts for the substantial upgrade to the MRE at Contact. These results at Contact and the recently completed upgrade to the Blanket MRE, both have the potential to improve the economics of the pending Scoping Study, which is set for completion. Contact Resource Grade Now Exceeds 3g/t Gold " (ann 21/03 today).

    Looks to be a growth story. Chart appears to have bottomed .074-.077. No CR needed. If you believe in Cu/Au story, a bargain buy around .076-.077. Parcel of over 5m went through half an hour ago.

    pmd3nka
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.