'Exploration Target Range' - due January, not sure if this defines the drilling zone of FME leading to the (delayed) FME JORC in April (see thoughts on my other post). But, JORC is delayed as they are drilling 50m and 25m intervals in some areas which may lead to some of the JORC defining as 'indicated' and/or 'measured' resource status, normally required before proceeding with a decision to mine (ie has to be better than just 'inferred' status)(not sure though what else is required besides a denser drill pattern to achieve a higher JORC status). Basically they are drilling the s*** out of FME as fast as they can
AGS Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held