I notice the Benfica well appears on your Volume preservation diagram.
I have always believed( unconfmed) that this is the TotalPetrofina well that MS suggested the Kwanza blocks were near.
I dont believe Benfica is operational anymore but cant find much.
Anyway re the Logbaba well cost.
Drilling will take place from a central pad located close to the LA-104 well site. This will minimize costs
of the relocation of local residents and ensure the security of the wells and future facilities. A centrally
located pad will reduce future operating costs in regards to maintenance of locations, roads, and
personnel requirements.
The cost assumptions shown below are in 2007 real terms:
• Twin drill LA 101, LA 102, LA 103, and LA 104 wells at US$10 million per well for the first three,
and US$12.25 million for LA 104
http://www.bramlin.com/Bramlin%20Admission%20Document%20November%202007.pdf
- Forums
- ASX - By Stock
- CVI
- nervous or excited
nervous or excited, page-55
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVI (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online