Going on all the information from previous announcements,,,,There is four intervals in the Wilcox to be perforated and tested,, they lie between 14,180 ft and 14760 ft.!
That's 580 ft of well bore, with 4 testing points, and a total of 75 ft of perforations planned..!
So far only 15 ft perforated..!
Highly likely that all four intervals will require frac treatment,,, so " Sue12's " idea on how we will get the news is most likely, i.e. slowly and over a period of time ,, Which is longer than our patience..!!
My guess is that it could take three weeks to frac and test all four,,, but " Sus's" the man with the best guess..!