The good thing is, with the power lines only 5km away, GRK can scale up the project as each stage comes on line. GDY however, has to build a big enough power station in one go to justify the cost of building 500km of power lines and cover the losses over that distance.
I don’t think GRK are going to get much cheaper than this.