Share
1,810 Posts.
lightbulb Created with Sketch. 14
clock Created with Sketch.
18/04/18
10:58
Share
Originally posted by tangs
↑
I clicked "like" on this because your points are valid ......however you fail to look forward !
It is the first JORC and although the grade is disappointing the size is near what I expected (predicted 700,000 ) .
There will be more and may well turn out to be more of an underground mine than a pit .
These feeder zones look like they lend themselves to underground mining .
They say the TOP CUT was applied between 5g/t and 80 g/t and obviously had an impact on the grade .
May be they can mine this stuff with a better head grade than is indicated here .
This was always "talked up" a little too much . Now we can view it a bit more realistically !
Expand
This jorc is based on 2.1 k length and 130 t0 200m depth. Its only 1/4 of the 8k length wise. Its open in all direction isnt it? First year of JORC, more to come OUTSIDE the 2.1k?