Plus;
The drilling was very quick; 167m in 4 days.
It looks like they can drill ave. 40m/day.
That tells me that the drill rig and crew has a high performance.
Next drill hole TD-002 (shown below on the drill plan graphic) has already been started yesterday, Thursday on 19th of April. I think it will be finished in 3-4 days and it will be finished on Sunday. Then the others will follow.
Drill pads won't change but drill directions may change according to the decisions of the geos.
We can see from the drilling plan that the drilling happens around the old trenches where the high grade lithium sampling were collected.
The most important and high grade trench was Trench-1 (TT17-01). It has two parts as you can see.
The first hole TD-001 was drilled 167m at the north of sampling area along the Trench4.
The second hole TD-002 (140m but may be deeper) will be drilled from a location close to Trench-01 towards towards to Trench4.
The first hole TD-001 had a dipping angle of 45 degree but the second hole TD-002 will go deeper by a 60 degree angle.
If you look at the old graphics of sampling results below you will see that the high grade Lithium samples were mainly found at the south of Trench-4 where the first hole TD-001 was drilled. They are Trench-01, 08 and 09.
Graphic from anns on Jan. 13
Graphic from anns on Jan. 17
- Forums
- ASX - By Stock
- GNM
- Ann: Completion Of First Drill Hole At Turesi
Ann: Completion Of First Drill Hole At Turesi, page-28
-
- There are more pages in this discussion • 122 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
-0.001(6.67%) |
Mkt cap ! $2.319M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.4¢ | $1.119K | 79.93K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 445000 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 127209 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 445000 | 0.013 |
3 | 732302 | 0.012 |
5 | 674925 | 0.011 |
6 | 1569995 | 0.010 |
2 | 433330 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 127209 | 1 |
0.015 | 211231 | 2 |
0.016 | 13303 | 2 |
0.017 | 227673 | 2 |
0.018 | 416660 | 3 |
Last trade - 15.29pm 14/10/2024 (20 minute delay) ? |
Featured News
GNM (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
SPONSORED BY The Market Online