I am expecting 150 million tonnes of measured and indicated resource from the 20,000 metre drilling program. Cut off grade to JORC a key as well. See post if want to have a stab at calculating JORC yourselves: Post #: 32752513
Consultants on site is what I would have expected so that Competent Person sign off becomes easier.
22 holes drilled end April, June 30 deadline IMO will be tight for complete 20,000 metre program JORC, so thinking there will be a preliminary JORC first and then the complete JORC August/September. 55 - 60 holes here to do the complete 20,000 program.
Nice tin results as well.
Results at the back of the Ann on an interval basis look great.
All IMO
AVZ Price at posting:
21.5¢ Sentiment: None Disclosure: Held