Some further point not to be missed
• Drilling progress is accelerating.
• AVZ’s camp has been completed, permitting increased support of its exploration activities. The camp includes a large core-yard, workshops, storage facilities, accommodation, offices and a dedicated kitchen with attached dining room. This extensive camp is necessary to support the scale of activities being undertaken by AVZ and its completion was achieved largely through local Congolese workers residing in Manono.
• The required site-visit by the consultants that will prepare the Resource Estimate has
been completed.
• Additional data required to support the preparation of a Resource Estimate, such as
topographic surveys, bulk density determinations and additional characterisation
investigations are in-progress.
• Preliminary metallurgical testing of material from drill holes MO17DD001 and
MO17DD002 is in-progress.
I believe the workers camp point should be noted. It doesn't appear that this camp is going to be disbanded once the drilling finishes. Looks like it's being set up for an extensive period of time.
Haplo
- Forums
- ASX - By Stock
- AVZ
- Ann: High-grade intercepts from first resource drill holes
Ann: High-grade intercepts from first resource drill holes, page-29
-
- There are more pages in this discussion • 174 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)