FBR 0.00% 5.3¢ fbr ltd

FBR Chart, page-3142

  1. 5,861 Posts.
    lightbulb Created with Sketch. 1998
    yes it’s pretty manual intensive job , blocks are lifted by excavator or bobcat then swung into position E7342B2A-32C0-49C6-BE73-6FB092A71AD3.jpeg by labourer , the mortar is mixed and dispersed onto the blocks just the same as a bricklayer would do with bricks . The blocks are also cut down using a wet saw .
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.000(0.00%)
Mkt cap ! $235.4M
Open High Low Value Volume
5.3¢ 5.6¢ 5.1¢ $922.1K 17.41M

Buyers (Bids)

No. Vol. Price($)
1 6423 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 613170 2
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.