The mill is planned to be operational in Early September quarter. That’s about a month’s time. Terrible shame if it all goes down in flames before then.
They’ve already stripped the sulphide pit - and if the sulphide grades are what they have been, 1.7g/t or more, that’s 48000 ounces a quarter. At $800 AISC ( due to stripping brought to this quarter), that’s your $20M. And it’s not even that spectacular - they did this in December quarter mining out that oxide pit.
Anyway, do what you must, and I do what I do.
- Forums
- ASX - By Stock
- BDR
- Ann: US$23 Million Capital Raising
Ann: US$23 Million Capital Raising, page-63
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BDR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online