88E 0.00% 0.2¢ 88 energy limited

ASX Today, page-11038

  1. 1,657 Posts.
    lightbulb Created with Sketch. 231
    Never March
    the Joint Venture having assessed the current rate of fluid recovery and, despite several encouraging trends, made the decision to shut-in for the Winter period due to logistical reasons associated with ongoing testing in Arctic conditions. The main issue is that of freezing of the borehole fluid, predominantly fresh water from the frac, over the ~1,300ft permafrost zone due to the low rates of fluid flow observed towards the end of the current test phase. Additionally, winterized equipment deemed suitable for executing efficient artificial lift of the frac fluid is currently unavailable. The forward plan is to optimise and re-initiate the flow testing, utilising artificial lift, in April/May 2018 when weather conditions are more favourable.

    Bulletin 21/09/17
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $96.19K 48.09M

Buyers (Bids)

No. Vol. Price($)
1 14125786 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 592032739 228
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.