HGO 2.78% 7.4¢ hillgrove resources limited

Ann: Primary Crusher Bearing Replacement, page-23

  1. 33,577 Posts.
    lightbulb Created with Sketch. 1764
    Hi VYR regarding
    "That is in fact a higher grade than the stockpile is forecast to finish at when mining stops. The forecast number is .22%
    VAA have done the hard work for you plough, read the valuation, all the numbers are there, . "

    The VAA forecast calculates out at 0.32% not o.22% for the forecast stockpile if one goes through the numbers of the VAA , I double checked it as well .
    My calculations show a loss milling less than 0.20% Cu , however what appears to be a low grade 0.25%cc Cu result for last quarter could well be an anomaly with future ore to the stockpile reporting with higher grade .

    Thank you for the franking calculations
 
watchlist Created with Sketch. Add HGO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.