Absolutely agree mate, imo, if for one minute mgt thought their timing was off for late Q2 maiden JORC, then they would have utilized the 5th rig Nigel said they had on call if needed. I also feel reason they are locked on to this timing, is because their is some arrangement in place to produce this JORC by this timeline. Hence also the 24/7 drilling with 4 rigs, prob more cost efficient than 5 rigs going at it..and allowing funds for phase 2 straight after..always good to stay under budget all imo. dyor
AVZ Price at posting:
16.5¢ Sentiment: Hold Disclosure: Held