You can see the costs involved:- Design, Engineering, Fabrication, Hydraulics, Transport and Crane Hire, Labour, WHS and Environmental Compliance. I rest assured that the Board have been here before with Arrow and Bow and leave it in their capable hands, great to see drilling begin and with the production from Kincora underway, AJQ are kicking goals. Great Video, Thanks. GLTA.