If it is a gas fired thermal oil based heating system (to allow good control of the process heat with PLC proportional oil flow control valves to process heat exchangers) then the system needs to be heated very slowly over a long period of time until the oil is safely above the water-steam phase change temp and then you can increase system temp up to operating temp fairly rapidly. But heating up a thermal system from a cold start does use a lot of gas and even more if it is cold ambient. Rincon was max 15C in the late afternoon last week but they likely had the heat plant warming all day and it was down near 7 degrees C in the early morning. It would be interesting to know what size burner is installed.
- Forums
- ASX - By Stock
- AGY
- Ann: Argosy confirms first batch of LCE produced
Ann: Argosy confirms first batch of LCE produced, page-433
-
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
-0.002(4.76%) |
Mkt cap ! $58.23M |
Open | High | Low | Value | Volume |
4.1¢ | 4.2¢ | 4.0¢ | $40.07K | 979.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 1135104 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 52750 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 1135104 | 0.040 |
13 | 2915102 | 0.039 |
11 | 619280 | 0.038 |
10 | 1041140 | 0.037 |
6 | 755115 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 52750 | 2 |
0.042 | 154846 | 3 |
0.043 | 300000 | 2 |
0.044 | 382711 | 3 |
0.045 | 123242 | 3 |
Last trade - 16.10pm 09/09/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |