GASNOR has a May update spreadsheet on installation progress.
The Salta Provence has only 3 current installs underway that have industrial users. Is one of the three for the Rincon project?
The industrial user installation for Salta reference numbers are 45,48 and 61 in the sheet.
They are all categorised as "Ramal" or branch lines - it each case it gives the diameter of the branch. In all cases the line diameter is listed as 51mm.
All three branch lines are stated as 90% complete, with respective install start dates of 11/1/17, 28/06/17 and 5/02/18 respectively
link to sheet download page : https://www.gasnor.com/informacion/102/mayo-2018
Fill your boots
- Forums
- ASX - By Stock
- AGY
- Ann: Argosy confirms first batch of LCE produced
Ann: Argosy confirms first batch of LCE produced, page-434
-
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
-0.001(2.63%) |
Mkt cap ! $53.86M |
Open | High | Low | Value | Volume |
3.8¢ | 3.8¢ | 3.5¢ | $359.1K | 9.763M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 2015083 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 157403 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1965083 | 0.036 |
26 | 3441867 | 0.035 |
10 | 928154 | 0.034 |
16 | 2581525 | 0.033 |
4 | 1305000 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 150000 | 1 |
0.038 | 225179 | 1 |
0.039 | 287418 | 3 |
0.040 | 690961 | 6 |
0.041 | 2615000 | 2 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |