I had a quick look tonight at the original JORC drilling hole locations, and then against the coordinates of the new ‘infill’ holes which were recently completed.
I think we will get a positive updated JORC resource, an upgrade you could say... why?
Check drill holes 68/69 from the original JORC;
68 was 3.85m @ 27.78% (371,158)
69 was 1.70m @ 19.11% (371,149)
Now recently we drilled hole 164 (371,163) on the same 6,468,690 northerly line;
Hole 164 was drilled 5m from 68, and returned about 1.00m @ 15% average (was 2 thin seams) Confirming another 5m, albeit a bit thinner...
From what I can see we will be adding to our JORC because we’ve now stepped out the drilling with success. Though i would need to look grid line by grid line to compare... and see if our step out drilling was successful in intercepting the ceasium.
- Forums
- ASX - By Stock
- ESS
- Ann: Binding offtake and funding agreement
Ann: Binding offtake and funding agreement, page-136
-
-
- There are more pages in this discussion • 102 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ESS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online