"Psa has stated once they have a permit it will be 3-6 months before restart." I thought that they already had the permit and all that was needed was to re-start operations?
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks