Old News Frog Man-Small Hammer Mill Very High Recovery Grades- all their to be read in old ASX releases.
Don't really wish to flood the thread with old news ATM as wishing to stay on topic.
More relevant is the Gravity Plant Appears to be running at or about full production
that from memory spec's out at or about 20 tonnes per hour through-put, this is will be
a game changer imo-think about it!
Gravity plant online -high tonnage through-put
MH-3- lower tonnage -running the very high grade material.
Waiting HM-4 diesel engine driven to be positioned at tailings or transitioned into plant
& tailings high grade material trucked up to the plant & used as additional feed .
salt
- Forums
- ASX - By Stock
- OGX
- Have a Ganda at the Gravity plant running at full spec?
Have a Ganda at the Gravity plant running at full spec?, page-9
-
- There are more pages in this discussion • 166 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)