G'Day all-Will through out some conservative numbers based on what we can see & therefore the plant
is running -two separate materials utilising two methods as seen above.
As previously ascertained to have 9.7 g p/t in tailings stockpile the average mill feed grade was running at 13.5 g p/t
that's average mill feed-prior to blasting & stope improvements -leading to much better improvement in minimising dilution.
If we just use an average grade recovered of 12g p/t x 20t per hr ( gravity plant ) x 11 hours running per day (12 hr shift 2x 6 hrs )
=2,640 grams- 84.88 OZ per day at 20 Day's per month =1,697 oz per month.
That's an allowance of approx. 10 day's RDO's for production guy's 7 allows plenty of time for maintenance to occur
Then you have the bonus of high grade through HM-3 -likely from Mestre Zone call this very high grade material 31 g p/t
or one OZ per tonne at only one tonne per hr through-put ultra conservative probably only 0.7 of a cubic mt per tonne per hr.
that's another 11 OZ per day x 20 days-220 oz
Total being 1,897 OZ per month-imo conservative & without allowing for HM-4 running tailings .
Just rough calculations -though they appear good & conservative understand people being sceptical given the history
though the gravity plant see running at or about full spec is great news.
imo-gltah
salt
- Forums
- ASX - By Stock
- OGX
- Have a Ganda at the Gravity plant running at full spec?
Have a Ganda at the Gravity plant running at full spec?, page-14
-
- There are more pages in this discussion • 161 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)