Miningnut, with that kind of metreage and the fact they hit the 6 expected gas bearing sands I would think the original estimate of 17.5bcf is highly likely to be achieved. Good to see the accuracy in their pre drill planning(yet again).
PSA Price at posting:
0.0¢ Sentiment: None Disclosure: Held